"Chun He Bao Guan Jian" has been introduced. This health supplement contains functional ingredients such as undenatured collagen type II, algae calcium, and olive fruit extract.
Algae Calcium, Olive Extract, Collagen Complex (Chicken Sternum Powder [containing Type II Collagen], Potassium Chloride), Magnesium Stearate (Excipient).
Algae Calcium 350mg, Olive Extract 100mg, Collagen Complex (Chicken Sternum Powder [containing Type II Collagen], Potassium Chloride)40mg, Magnesium Stearate (Excipient)10mg; total 500mg.
In addition to adhering to ISO and HACCP standards for process quality control, the contract manufacturer complies with Ministry of Health and Welfare announcements by retaining at least two boxes from each batch as samples for future inspections. Beyond the mandatory control procedures required for certifications, detailed production control measures have been established to ensure quality throughout the manufacturing process. The process begins with the sales department converting customer orders into operational documents. Production control and inventory management personnel then use these documents to plan production schedules and prepare materials. During manufacturing, all operational staff follow specified inspection standards for self-checks. If any abnormalities are detected, they complete a Quality Issue Report and address the issue according to the established Quality Issue Handling Procedures. Once the finished products are packaged, the department supervisor notifies quality control personnel to conduct product quality inspections. This comprehensive system ensures effective monitoring and quality control from raw materials to finished products at all verification points.
Microbiological testing 2. Heavy metal testing 3. Authoritative Western medicine testing
Certificate of Analysis (COA) from the raw material supplier 2.Quality control of raw materials is conducted according to the "SI-01 Raw Material Acceptance Management" procedure 3.Quality control of semi-finished products is conducted according to the "SI-03 Semi-Finished Product Quality Management" procedure 4.Quality control of finished products is conducted according to the "SI-04 Finished Product Inspection" procedure 5.Inspection results during the production process 6.Finished product inspection results
CanadaCA2459981C Japan JP4800574B2 European EP1435906B1 United States US7083820B2 United StatesUS9066926 TunisiaBD17842 Portugal PT1369407E Morocco MA26001A1